2A-Maintenance EPR Bullets
Think these EPR and OPR bullets are helpful? Register and submit your bullets today!
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:27:22
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Managed DIFM program--met ACC 48 hr parts turn-in goal--key to 4.7 CANN rate; smashed ACC std by 66%
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:26:26
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Key member in AFSO21 event--streamlined "Red Ball" maintenance procedures--reduced launch time by 20%
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:25:14
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Leaned E-8C Isochronal Inspection process; streamlined flow/saved 192 man-hours--reduced down-time 15%
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:22:29
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Focal point for AMXS Data Integrity Team-ensured data accuracy across 6 flights and 33.6K lines of data
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:21:56
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Managed acft structural integrity program--accurate data for engineering analysis--ensured E-8C flight safety
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:21:43
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Input 3.2K pilot reported discrepancies--ensured accurate mx documentation--98% error-free rate by DIT
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:21:03
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Lead IFC technician in AMXS--drove generation of 1,632 sorties/13,768 flight hours--highest tempo to date
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:16:30
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Spearheaded mx on 17 LOX/GOX carts valued at $99K+; phenomenal 93% MC rate--highest rate seen to date
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:15:17
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Drove boost pump TCTO; completed 17 E-8C acft 180 days before ground date--ensured integrity of AF assets
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:14:57
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Oversaw 67 IDG overhauls/inspections; key to electric shop's 97% QA pass rate--100% availability/six WRE
Login to vote.
First Prev -- Page 3 of 9 -- Next Last

