2A-Maintenance EPR Bullets
Think these EPR and OPR bullets are helpful? Register and submit your bullets today!
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:59:23
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Directed flawless debrief pgm--contributed to 14th AF Outstanding Unit Award--zero findings during LSET
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:55:55
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Partnered w/mx contractor to rectify inop flt surface LRU; averted LD/HD asset impound--acft FMC in 11 hrs
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:55:37
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Implemented improved prgm/mx form review procedures; 156 QA reviews/94% pass rate--33% cut in errors
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:55:15
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Enforced strict mx discipline and safety--led section to an outstanding 92% QA pass rate--ready for SMSgt!
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:54:59
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Provided MIS refresher trng to 85 crew chiefs--slashed error rate by over 50%--bested ACC std by 3% points
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:54:32
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Oversaw de-icing procedure review--revised operating instruction--inclement weather launch time cut 10%
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:52:16
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Mobilized mx for first-ever PACOM msns--sched 17 pallet, 72 ton support package--msn lauded by 7 AF/CC
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:51:41
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Directed flt LSET prep; drove 91.6% "Excellent" rating; awarded only MXG Honorable Mention--chief now!
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:50:58
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Orchestrated E&E "tiger team" depot-level duct repair; drove 3-day local fix--bolstered 82% wing MC rate
Login to vote.
EPR OPR Bullet Posted By: nevel182    On: 2008-06-17 06:49:26
      
  
Ave. rating: Not Rated from 0 Votes.
  
Ave. rating: Not Rated from 0 Votes.
Steered eng control rebuild; avoided 72 hr supply delay using job surplus--acft met scheduled sortie—promote
Login to vote.
First Prev -- Page 1 of 9 -- Next Last

